Sharjah Golf Club (Sharjah / United Arab Emirates)
 
Design a master plan amongst spectacular sand dunes to include the club house, access road and an 18 hole golf course with a pitch and putt and generous practice facilities. The plans were approved in December 2006 but the client later decided to add some real estate. The re-design of the master plan includes the location of the real estate. The detailed drawings, specifications and tender documents were and approved by March 2008 after final consultations with the urban architects and local authorities.
 
click to enlarge click to enlarge      
 
23 Feb 2009: This project has been put on hold due to the global meltdown.
 
10 Feb 2009: Site Visit
 
click to enlarge click to enlarge click to enlarge click to enlarge click to enlarge
click to enlarge click to enlarge click to enlarge click to enlarge click to enlarge
click to enlarge click to enlarge      
 
02 Feb 2009: Construction has started on another Harradine course in the Emirate of Sharjah
 

“Sharjah Golf Club” is an 18 hole golf course with an enormous down hill driving range and a 9 hole pitch and putt. The fantastic dunes have provided a great layout which meanders in and along the spectacular landscape.

 

The Club House is perched at the highest point of the site and provides spectacular views of the driving range and half the course.

 

The par 72 course, totals 7203 yards from the back tees and offers dramatic contouring, strategic hazards, seven big lakes and many natural rough areas. The player will experience dynamic visual changes of landscape throughout the course which should enhance his overall golfing experience.

 

The contractor Al Ula Int’l Eng and Cont.Co. LLC has been given 200 days to complete phase 1 which consists in staking the complete site, bulk earthworks, construction of gravel service road and boundary fence.

 

Documents for phase 2, which includes the complete construction of lakes, golf course, irrigation and lighting, are being prepared with a view to go to tender by mid April.

 
22 Dec 2008: Site Visit
 
A knock-off meeting was arranged for the beginning of the earthworks contract at the Sharjah Golf club site.
 
click to enlarge click to enlarge click to enlarge click to enlarge click to enlarge
click to enlarge click to enlarge click to enlarge click to enlarge click to enlarge
click to enlarge click to enlarge click to enlarge click to enlarge  
 
 
Image Gallery
Press
Reference List
Course Events