Design a 9 hole golf course with driving range within an existing design of a real estate complex. Alter real estate boundaries as much as possible without disrupting the initial master plan and prepare tender documents. Construction on the bulk earthworks (Phase 1) started in November 2006 and were completed in May 2007. |